Chaefeler, Leipzig, Germany
2020
CHAEFELER NEOVIA project in Leipzig, Germany. 1. Electrical Installation of MULTICASE conveyors (MCS), 28 PLC’s: PLC01, PLC04, PLC07-11, PLC14-19, PLC21-22, PLC24-28, PLC31-36, PLC38 -39. 2. Electrical Installation of BK25 conveyors, 8 PLC’s: PLC56, PLC58, PLC59, PLC61, PLC64, PLC65, PLC66, PLC67. 3. Electrical Installation of 14 isles, Dematic Multishuttle (DMS). 4. Electrical Installation 16 units of VTW: • A56: TCP10, TCP20;
• A58: TCP10, TCP20;
• A59: TCP10, TCP20, TCP30;
• A61: TCP10, TCP20;
• A64: TCP10, TCP20; • A65: TCP10, TCP20, TCP30;
• A67: TCP10, TCP20 5. Electrical Installation of power supply of fire alarm (STÖBICH) system, for: PC56, PC60, PC66, DEMATIC MULTI-SHUTTLE (DMS). 6. Electrical Installation of Safety System Network for PLC’s: CC1SCP01; CC2SCP01; CC3SCP01. 7. Electrical Installation of Pick-To-Light system for PLC’s: PLC01, PLC04, PLC07-11, PLC14-19, PLC21-22, PLC24-28, PLC31-36, PLC38 -39.
• Routing of Cable way (cable tray, pipe).
• Mounting of Bus Bar.
• Mounting of Screens
• Mounting of Control cabinets, 12 sets: PBL01, PBL11, PBL21, PBL22, PBL23, PBL24, PBL25, PBL31, PBL32, PBL33,
PBL34, PBL35.
• Laying of Cables.
• Electrical connection of control cabinets, 12 sets.
• Assembly of working places, 124 sets.
• Connecting of power supply.